Vacancy expired!
- Work with RA and get all the filing information for each country out of Veeva RIM
- Identify all Level 3 changes and link to change controls
- Get all the open Major/Critical change control out of Veeva
- Identify all the countries listed and link one for one in RIM and statuses and timelines and support closure of change controls
- With the Veeva Vault change control
- Identify all the master data setup and master data that wasn’t setup.
- Look at all SAP master data and proceed with a project to obsolete all materials that
- No inventory
- Remove from all BOM’s, Recipes, PV and move material master to obsolete.