FULL TIME AIRCRAFT MANUFACTURING BACKGROUND WILL BE NEEDED.
FIRST PIECE INSPECTIONS, AS9100 FIRST ARTICLE REPORTS, CALIBRATION, ALL THE REPONSIBILITIES WITHIN
INSPECTION DEPARTMENT.
MUST BE ABLE TO PROGRAM AND RUN CMM.
FULL TIME BENEFITS ARE AVAILABLE.
HOURS 8:00AM - 4:30PM